Overhead Conveyor Project Timeline: From Inquiry to Production

What happens between your first inquiry and full production, and how to keep the schedule on track.

Powder line with overhead conveyor on green support columns

A conveyor project runs through clear phases. Their length depends on size and site conditions, but the order is always the same, and so are the things that cause delays.

The Phases

Project phases
PhaseWhat happensWhat you provide
1. InquiryRequirements and data collectionLayout, products, output
2. Concept and quoteTechnology, route, simulation, budgetFeedback on concept
3. Order and engineeringDetailed design, approvalsApprovals, interface data
4. ManufacturingFabrication, purchasing, factory testAttend factory test
5. ShippingPacking, freight, customsSite readiness
6. InstallationSteel, track, drives, controlsAccess, utilities, shutdowns
7. CommissioningTests, training, ramp-upOperators, products for tests

Durations vary with scope; we give a schedule with every proposal.

Conveyor installation with platforms in a plant
Installation is planned around production and other trades.

What Causes Delays

  • Late or changing product data
  • Building not ready: roof checks, utilities, floors
  • Slow approval of drawings
  • Customs and inland transport not planned
  • Short or moved shutdown windows

How to Speed It Up

  • Send complete data with the first inquiry
  • Name one decision-maker on your side
  • Agree interfaces with other suppliers early
  • Attend the factory acceptance test
  • Prepare the site before the equipment arrives

See our installation and commissioning service and layout design.

FAQ

Questions About This Topic

Still have a question? Ask our engineers.

How long does an overhead conveyor project take?

It depends on size and site conditions; we give a schedule with every proposal.

What delays conveyor projects most?

Late product data, building readiness, slow approvals and short shutdown windows.

Can installation happen while production runs?

Often yes, by pre-building sections and installing them in planned shutdowns.