Installation & Commissioning

Site work planned around your production, tested step by step and handed over with trained staff.

Electric monorail installation on platforms in an automotive plant

From Delivery to Full Output

Installation is where schedules are won or lost.

We pre-assemble and test modules in our factory, pack them by installation area and plan the site work with your team, including shutdown windows and work with other trades. On site, our supervisors lead installation, mechanical and electrical tests, commissioning and ramp-up.

Orange and blue overhead conveyor curves being installed

Scope

What Is Included

  • Site planning

    Installation sequence, lifting plans and shutdown windows.

  • Supervision

    WANSUN supervisors with local or WANSUN installation crews.

  • Mechanical tests

    Alignment, chain tension, switches and lifts checked and recorded.

  • Electrical tests

    Wiring, safety circuits and I/O checks.

  • Commissioning

    Control logic, interfaces and output tests.

  • Training

    Operator and maintenance training with documentation.

What You Receive

  • Installation and test records
  • Site acceptance test report
  • Operating and maintenance manuals
  • Spare parts recommendation
Tip: the more product and building data you share at the start, the faster we can return a reliable concept. See our engineering blog for checklists.

FAQ

Questions We Hear Often

Still have a question? Ask our engineers.

Do you install outside China?

Yes. We supervise installation worldwide and can work with local installation contractors.

How long does installation take?

It depends on the scope and site conditions. We give a schedule with the proposal and plan it with your shutdown windows.

Do you train our staff?

Yes. Operators and maintenance staff are trained on site, with manuals and spare parts lists.

Send us your layout. Get an engineer's answer.

Share a drawing, your products and the output you need. We reply within 24 hours with questions or a first concept.